Issue Description
Our client reported issues with the copper piping connected to two boilers located on the roof, specifically concerning leaks in the copper pipes.
Actions Taken
- Initial Inspection:
- We scheduled an appointment with the landlord to inspect the piping system.
- Upon inspection, we discovered that all the copper pipes had clamps and were leaking.
- Decision and Scheduling:
- The landlord decided to replace all the copper pipes connected to the two boilers.
- We scheduled the replacement work to be conducted at night to minimize disruption.
- Execution:
- The project was set to run from 10 PM to 6 AM over the course of two nights.
- Our team replaced all the copper pipes within the scheduled timeframe.
- Final Testing:
- After completing the replacement, we conducted thorough testing to ensure there were no leaks in the new piping system.
Result
The replacement of the copper pipes connected to the two roof boilers was successfully completed within the scheduled timeframe. Thorough testing confirmed that there were no leaks, and the piping system was functioning properly. The client expressed satisfaction with the timely and effective service provided.