Overview
We received a request from a client for the installation of 25 sub water meters in an apartment building. This project required obtaining city permits.
Actions Taken
- Initial Consultation:
- We scheduled an appointment with the building manager to conduct a walkthrough of the property.
- Together, we reviewed each sub meter location to ensure proper fit and identify any potential issues.
- Permit Acquisition:
- We promptly obtained the necessary city permits to commence the project.
- Installation Process:
- Our technicians installed each sub water meter, ensuring that all connections were properly made and secure.
- Final Inspection:
- Upon completing the installation, we conducted a thorough inspection to verify that all sub meters were functioning correctly.
Outcome
The installation of the 25 sub water meters was successfully completed. All meters were verified to be functioning properly, and the project was executed in compliance with all required permits and regulations. The client expressed satisfaction with the efficiency and professionalism of our service.