Shower Valve Installation

Issue Description

We received a call from our client requesting the installation of an emergency shower valve for a manufacturing facility. This installation is part of a broader initiative to enhance safety measures for employees working with chemicals or manufacturing machinery.

Actions Taken

  1. Site Assessment:
    • We identified the appropriate location for installing the emergency shower valve and determined the placement of the sewer and water lines.
  2. Installation:
    • We installed plastic panels on the wall to prevent water leakage inside the walls during emergency use.
    • A small basin was installed and connected to the sewer line to manage any water flow from the emergency shower.
  3. Post-Installation Testing:
    • The emergency valve was thoroughly tested to ensure proper functionality and to confirm that there were no water leaks.
    • The installation was verified to be accurate and operational.
  4. Cleanup:
    • After completing the installation, we cleaned the entire work area to ensure it was left in pristine condition.

Result

The emergency shower valve was successfully installed and tested. The installation was completed with no water leaks, and the work area was thoroughly cleaned. The client can now ensure the safety of their employees with the newly installed emergency shower system.