Issue Description
We received a call from the client requesting the installation of a tankless water heater to replace an existing tank-style water heater.
Actions Taken
- Initial Assessment:
- An appointment was scheduled for the following day to evaluate the project requirements on-site.
- Upon arrival, we assessed the existing setup, including the old water heater tank, and discussed the client’s request for a tankless water heater installation.
- Pre-Installation Checks:
- We inspected the gas line size to ensure it was compatible with the new tankless unit.
- The hot and cold water supply lines were checked for adequacy.
- We reviewed the number of bathrooms and the existing ventilation to determine if a new vent was necessary or if the current one could be utilized.
- Approval and Preparation:
- After confirming all requirements and obtaining approval from the homeowner, we proceeded with the following steps:
- Drained and removed the old water heater tank.
- Installed the new tankless water heater in the existing location.
- After confirming all requirements and obtaining approval from the homeowner, we proceeded with the following steps:
- Installation Details:
- Installed the tankless water heater, including connections for the gas line, hot and cold water supply lines, circulation line, and venting system.
- Post-Installation Testing:
- Conducted thorough testing of the system to ensure there were no gas or water leaks.
- Verified that the tankless water heater was operating correctly and efficiently.
- Cleanup:
- The work area was cleaned thoroughly upon completion of the project.
Result
The installation of the tankless water heater was successfully completed within four hours. All system components were tested, and the unit was confirmed to be leak-free and functioning properly. The project was completed to the client’s satisfaction, with the work area left clean and orderly.